| Function | Pros | Cons | |
| Economizer | Utilises the waste heat from flue gas for heating the feed water temperature | Reduces fuel consumption by 4-5% | Space taking, viable for highly functional units and also requires government regulations |
| Air Pre Heater | Uses the waste flue gas to heat the feed air of boiler | Reduces fuel consumption by 2-3% and lower government regulations | Requires consistent running boiler and less effective on low moisture fuel. |
| Solar based feed water heater | Heats feed water before entering the boiler with help of solar panels. | Faster ROI as the investment costs are low, 2-3% fuel savings. | Works only on sunny days. Thus, the operations has to be synchronized. |